Research Collection · Research notes
Kodingamali and Baphlimali: output, processing and accountability
Kodingamali and Baphlimali: output, processing and accountability — dated evidence and scope.
Dated evidence and open questions. These notes preserve the sources’ reporting periods and research limits; they do not confirm current services, permissions or investment returns. Specialist review remains open.
Sections in these notes
Two bauxite mines, two different stories. OMC’s Kodingamali adds a regulator-recorded output series. Baphlimali connects a mine to the Utkal Alumina refinery and an international certification record. Neither capacity nor certification measures mineral revenue or household prosperity.
Kodingamali: consistent output, a separate expansion plan
IBM’s September 2024 inspection records 3 million tonnes of ROM bauxite in FY2023–24, against a 6 million-tonne proposal. It explicitly identifies a 3 MTPA environmental-clearance constraint. This is a historical inspection, not confirmation of today’s permission.
| Financial year | Actual ROM tonnes | Proposed tonnes |
|---|---|---|
| 2019–20 | 3,000,000 | 3,000,000 |
| 2020–21 | 2,999,500 | 6,000,000 |
| 2021–22 | 3,000,000 | 6,000,000 |
| 2022–23 | 3,000,000 | 6,000,000 |
| 2023–24 | 3,000,000 | 6,000,000 |
Five observations span four elapsed years: this is a broadly flat series. The register identifies OMC, mine code 07ORI09005 and Koraput. Its non-captive classification does not identify a buyer. Rehabilitation-area observations remain held until their annual/cumulative basis is clear. IBM, PDF pp.1–5.
Baphlimali: a documented mine-to-refinery link
The ASI audit describes bauxite travelling by covered conveyor to Utkal Alumina’s refinery. Its overview reports approximately 1,017 people, including 82 women, and 8.5 MTPA capacity. These are audit-period site figures; local residence and comparable workforce categories remain unverified. The annual-return follow-up below supplies a separate FY2024–25 output measure. The overview describes a lease spanning Rayagada and Kalahandi, so the registered district alone must not become a whole-mine geographic boundary. Audit, PDF p.4.
Certificate 557 was issued 19 May 2026, with an expiry date 18 May 2029 subject to continuing conformance. Its scope covers bauxite mining and related processing/transport; the refinery is expressly excluded. Certificate and audit, PDF pp.1–4. The issuer’s announcement records nine minor non-conformances requiring corrective action. ASI announcement.
Retain the findings alongside the milestone. For example, the audit’s forced-labour criterion finding concerns inadequate statement coverage; the auditors report finding no forced labour. A living-wage assessment was missing, and documented overtime guidance was incomplete. Corrective-action closure is not yet verified. Audit, PDF pp.17–18.
Evidence that needs reconciliation
Hindalco’s undated page contains 8.5 MTPA in its header and 7.0 MTPA in its body. Its 18.5 km conveyor description also differs from the audit’s 18 km. Preserve the respective records rather than manufacturing a single precise current value. Company profile.
A compliance-index link retrieved under Baphlimali led to a report whose cover names Bimarla in Jharkhand. It is excluded from Odisha observations. The annual return and the actual Baphlimali compliance report have now been read as text; retrieval limits are recorded below.
Detailed observations, conflicts and next source routes · Koraput · Rayagada · Kalahandi.
Mining overview: Connects mine identities and reported output to separate work, permissions and community questions.
Existing NALCO chain supplies a separate processing case; do not combine company or mine totals without boundaries.
Annual-return follow-up · 2 October 2026 UTC
Baphlimali reports 7.657 million tonnes of ROM bauxite in FY2024–25. Its annual return records 7,657,426 tonnes produced and 7,657,000 tonnes dispatched for captive consumption by Utkal Alumina. Opening stock plus production minus dispatch equals closing stock; the 426-tonne difference is preserved.
The mine reports ₹64.22 crore paid to DMF for that financial year, converted from ₹642,173,879. This is a company payment disclosure, not proof of completed local projects or money received by households. FormG-1, PDF pp.6,12–13.
The work table separates 9,763 direct and 193,300 contract person-days. Its 556.3 average daily persons employed cannot be compared as growth against the later ASI approximate 1,017 people. Complex table fields await visual review; local residence remains unknown. FormG-1, PDF p.4.
The compliance report distinguishes 8.5 MTPA EC capacity from 8.0 MTPA operating consent, citing an order valid through 31 March 2027. Its scanned consent annexure was not readable, so this remains the company’s September 2025 account. Compliance report, PDF pp.2,11.
Backfilled, afforested and reclaimed-rehabilitated areas also have different labels and dates. District-area headings do not reconcile to one lease total. Both comparisons are held. Direct PDF downloads failed; readable publisher text supports this checkpoint, with no visual or human review claimed.
Kodingamali: what restoration work can tell us · 3 October 2026
3,750 saplings planted in FY2023–24 is the clearest planting measure in IBM’s report. Its actual-column baseline of 17,357 plus those additions reconciles to the cumulative count of 21,107. This describes reported planting; the report does not supply a survival survey. IBM, PDF pp.5,7, rows6b and8f.
| Work reported for FY2023–24 | Actual | Interpretation |
|---|---|---|
| Mined-out area under backfilling | 12.98 hectares | Physical work, not proof of ecological recovery |
| Topsoil reused for restoration/rehabilitation | 56,845 cubic metres | Reuse volume, not a soil-quality measurement |
| Saplings planted during the year | 3,750 | Planting count, not surviving mature trees |
The corresponding row5b backfilling plan was 12.95 hectares, and row5c topsoil-use plan was 60,500 cubic metres. Both actual work and the shortfall against the topsoil plan remain visible. These are dated inspection figures, not a current environmental rating. PDF p.5, rows5b–c.
The 8.80 hectares labelled total reclaimed and rehabilitated remains a separate held measure: annual/cumulative scope is unresolved. Worked-bench, backfilled-area and waste-land afforestation have different table headings. Their 0, 1.9 and 0 hectare entries cannot be added or turned into a single greening rate. The watch-and-care cost row also needs clarification before comparison; its raw values are preserved in the structured case.
The report records monitoring and road sprinkling, but these rows contain no pollutant readings or sample details. Its favourable comment concerns the landscape’s appearance during the inspection. Neither statement establishes clean air, safe water or absence of ecological harm. PDF pp.6–7, rows6e,8h–i.
Forest evidence: Connects reported mine planting with forest measurement while keeping planting counts distinct from survival, forest cover and ecological recovery.
Next evidence: dated monitoring annexures, plantation survival/species records, area-category definitions and the cost ledger. No human review or current operational verification is claimed.
Baphlimali: measuring the environmental story · 3 October 2026
The company reports converting 32,200 kg of organic waste to manure in FY2025. This is input waste handled, not finished compost, revenue or avoided carbon. Its FY2024–25 statement also reports 413 cubic metres/day for industrial uses such as dust suppression and 214 for domestic/other uses. “Nil” process water does not mean the mine uses no water. FormV, PDF pp.3,6.
The air rows give PM10 as 39.74 and PM2.5 as 17.88, but sample dates, station coverage and averaging periods are missing from the summary. Printed measurement and comparator units also differ. These figures are held from clean-air comparisons. FormV, PDF p.4.
The certification audit reports monitoring results within limits while recording a minor non-conformance for unmonitored mine-vehicle emissions. It describes progressive rehabilitation, but its survival claim lacks the survey denominator/method. The planting-count wording and biodiversity-priority descriptions also need clarification. ASI audit, PDF pp.10–14.
Air-quality evidence: Connects mine monitoring with air-quality statistics while preserving station coverage, averaging periods and incompatible units.
Detailed case and held claims keep the closure-plan timing discrepancy, conflicting area categories and source-access failures visible. This checkpoint establishes neither current compliance nor completed ecological recovery.
Sources to follow
- IBM Kodingamali inspection: FY2023–24 and five-year ROM series
- Baphlimali ASI certificate 557 and initial audit report
- Hindalco Baphlimali Bauxite Mines: operating profile
- ASI Baphlimali certification announcement
- Baphlimali Form G-1 annual return 2024–25
- Baphlimali environmental compliance: April–September 2025