ROOTED IN ODISHA. OPEN TO THE WORLD.ପ୍ରୋଜେକ୍ଟ ଓଡ଼ିଶା
Project Odisha
Menu

Statistical Topic · Research notes

Ports

Ports — source-linked research, scope and reuse notes.

Dated evidence and open questions. These notes preserve the sources’ reporting periods and research limits; they do not confirm current services, permissions or investment returns. Specialist review remains open.

Sections in these notes

What these measures explain

How much cargo moves through the port? Throughput describes handled cargo and can include domestic coastal movements; it is not the value of Odisha exports.

Selected facts to explore

  • Total cargo throughput: 150.41 million metric tonnes — 2024–25, Paradip Port.1
  • Total cargo throughput: 156.45 million metric tonnes — 2025–26, Paradip Port.1
  • Coastal cargo throughput: 63.71 million metric tonnes — 2024–25, Paradip Port.2

Read this in context

Subject: Economy, livelihoods and infrastructure. Also part of Places and geography.

These are editorial reading connections, not assertions of causation, proximity or a verified supply chain.

Evidence view

Measure Value and unit Period / geography Evidence and readiness
Total cargo throughput 150.41 million metric tonnes 2024–25; Paradip Port reported-outcome; source_checked_editorial_review_pending1
Total cargo throughput 156.45 million metric tonnes 2025–26; Paradip Port reported-outcome; source_checked_editorial_review_pending1
Coastal cargo throughput 63.71 million metric tonnes 2024–25; Paradip Port reported-outcome; needs_source_table_review2

Interpretation limits

  • Port throughput, not Odisha exports or production; includes inward and outward cargo. Authority reports #2 among major ports in FY2025–26, #1 in FY2024–25.
  • Subset of total throughput; do not add to total cargo.

The structured atlas retains indicator IDs, exact source locators and definitions. Coverage and gaps · Atlas home.

Cargo is almost flat so far this financial year · 11 October 2026

Paradip’s cargo was up just 0.16% through 10 October, with 80.691 million tonnes in FY 2026–27 against 80.561 million tonnes through the same date in FY 2025–26. The increase was 129,652 tonnes. This is a partial-year comparison, separate from the full-year figures above.3

Matched reporting window Prior year, metric tonnes Current year, metric tonnes Calculated change
1 April–10 October 80,561,351 80,691,003 +0.16%
1–10 October 3,781,301 4,727,031 +25.01%

The stronger first ten days of October have not translated into comparable growth across the financial year so far. Neither window is a forecast. These are cargo movements at Paradip, including inward and outward flows serving a wider hinterland; they do not measure Odisha-origin exports, economic impact or capacity. The report is dated 11 October and its cargo summary closes on 10 October. Exact integers and the two calculations are retained in the structured records.

Container trade in its own unit · 4 October 2026

The 2 April 2025 release reports 12,711 TEUs of EXIM container traffic for FY2024–25. TEUs are container-size equivalents; the figure is not tonnes, unique physical boxes or Odisha-origin export value. Source, EXIM paragraph. The world-connections synthesis explains why port throughput and producer exports require separate records.

Longer series: cargo and vessel time

The port comparison retains every annual Dhamra and Gopalpur cargo value in Table30. Structured observations separate tonnes from vessel hours.

Fiscal year Dhamra, million tonnes Gopalpur, million tonnes
2015-16 14.71 0.24
2016-17 21.42 1.05
2017-18 21.45 1.15
2018-19 20.68 1.51
2019-20 29.71 5.56
2020-21 32.38 10.65
2021-22 33.44 8.10
2022-23 31.28 7.43
2023-24 43.32 11.44
2024-25 46.08 6.00

Paradip’s average vessel turn-round time was 58.08, 53.16, 46.27, 41.24 and 44.88 hours across2020–21 through2024–25 (Table12). The latest increase remains visible; this is not a current service promise or a cost estimate.

Hold the 2023–24 non-major total: Table30 reports54.75 million tonnes; Table31 reports54.24. The respective displayed components sum to54.76 and54.25. Preserve both reported totals and locations pending clarification; no state growth or commodity-share calculation uses this disputed denominator. The 2024–25 total is52.08 in both tables.

Original ministry report, printed pp.23,41–42 / PDF pp.33,51–52; checked4October2026.

Footnotes

  1. Paradip Port Authority: Major Achievements ↩ ↩2 ↩3 ↩4

  2. Paradip Port Cements Its Position As Numero Uno among Indian Major Ports, 2 April 2025 ↩ ↩2

  3. Paradip Port Authority daily report,11 October 2026, PDF p.3, cargo footer. ↩

Sources to follow