Research Collection · Research notes
Cement and fertilisers: plant output and district questions
Original plant tables, product mix, sales and scope limits.
Dated evidence and open questions. These notes preserve the sources’ reporting periods and research limits; they do not confirm current services, permissions or investment returns. Specialist review remains open.
Sections in these notes
A small total increase can conceal a large change in product mix. IFFCO’s Paradeep unit reported 22.31 lakh tonnes of NP/DAP in FY2025–26, about 0.8% above the preceding year. The component table shows DAP rising while its NPK-labelled row fell. This is one unit’s output, not Odisha’s fertiliser production or farmers’ consumption.
Paradeep: follow the products and the sales separately
| Financial year | NPK-labelled output | DAP output | NPK-labelled sales | DAP sales |
|---|---|---|---|---|
| 2021–22 | 5.30 | 14.65 | 6.80 | 14.23 |
| 2022–23 | 6.54 | 15.34 | 5.76 | 15.05 |
| 2023–24 | 4.37 | 16.81 | 4.77 | 16.55 |
| 2024–25 | 7.09 | 15.04 | 6.75 | 15.82 |
| 2025–26 | 6.44 | 15.87 | 6.79 | 15.77 |
Unit: lakh tonnes. The original IFFCO report’s printed p.130 preserves these plant rows; printed p.48 supplies the NP/DAP total. The differing NPK/NP labels are retained without inventing grade equivalence. The budget for 2026–27 is excluded. Sales can differ from production; the table does not establish an inventory reconciliation or where buyers used the fertiliser. Original report.
Rajgangpur: cement rose, captive-power generation fell
| Measure | FY2023–24 | FY2024–25 | Change |
|---|---|---|---|
| Clinker, tonnes | 2,253,961 | 2,637,076 | +17.0% |
| Cement, tonnes | 2,944,016 | 3,186,973 | +8.3% |
| CPP electricity, MWh | 359,112 | 336,893 | −6.2% |
| Waste-heat recovery electricity, MWh | 47,386 | 55,292 | +16.7% |
Dalmia’s dated environmental submission covers Lines 1, 2 and CPP, not every Rajgangpur line. PDF p.6 supplies the production rows. Clinker is an intermediate material; adding it to cement double-counts stages. Electricity generated is not electricity sold. This company submission does not independently establish compliance or explain the power decline. Original statement.
A company name is not a geographical boundary
Paradeep Phosphates is distinct from IFFCO. Its 2025–26 report maps facilities in Paradeep, Goa, Mangalore and Mahad. On printed p.108, its narrative gives 3.36 million tonnes while the table gives 3,666,516 tonnes. That discrepancy is held for clarification; neither company figure is accepted as the Odisha plant’s output. Original report, printed pp.20–21 and 108.
Questions worth turning into district business research
For Jagatsinghpur, investigate plant-qualified bagging, maintenance, testing and freight services. Product output is a starting signal; actual tenders, buyer specifications, vendor qualifications and payment terms are still required.
For Sundargarh, investigate maintenance, material testing and equipment support around the defined cement lines. Verify contracts and input specifications before estimating a market. A factory’s material needs do not prove that a new local supplier can win orders.
Land availability, permissions for a defined business, local hiring, margins and current orders remain unknown. These are research hypotheses, not ready investment recommendations.
Connected reading
- Manufacturing output and suppliers — links metals with these distinct product chains.
- Industrial production — preserves physical output versus economic value added.
- Jagatsinghpur — district context does not turn a unit observation into a district total.
- Sundargarh — links the cement evidence with the existing district record.
Structured evidence and unresolved fields. Food-processing output remains the next independent gap.