Statistical Topic · Research notes
Industrial Production
Industrial Production — source-linked research, scope and reuse notes.
Dated evidence and open questions. These notes preserve the sources’ reporting periods and research limits; they do not confirm current services, permissions or investment returns. Specialist review remains open.
Sections in these notes
What these measures explain
What physical output do the named companies report? Product, company and location boundaries need to match before constructing a state industrial series.
Selected facts to explore
- Bauxite excavated: 76.48 lakh tonnes — 2024–25, NALCO company operations, Odisha-linked.1
- Bauxite excavated: 77.01 lakh tonnes — 2025–26, NALCO company operations, Odisha-linked.1
Read this in context
Subject: Economy, livelihoods and infrastructure.
- Banking And Credit — Read another dimension of this subject; the measures remain separate.
- District Banking — Read another dimension of this subject; the measures remain separate.
These are editorial reading connections, not assertions of causation, proximity or a verified supply chain.
Evidence view
| Measure | Value and unit | Period / geography | Evidence and readiness |
|---|---|---|---|
| Bauxite excavated | 76.48 lakh tonnes | 2024–25; NALCO company operations, Odisha-linked | company-reported-outcome; needs_source_table_review1 |
| Bauxite excavated | 77.01 lakh tonnes | 2025–26; NALCO company operations, Odisha-linked | company-reported-outcome; needs_source_table_review1 |
Interpretation limits
- NALCO company scope; capital spending is not proven wholly within Odisha. Excavation differs from transportation and metal output.
The structured atlas retains indicator IDs, exact source locators and definitions. Coverage and gaps · Atlas home.
Mine-to-processing checkpoint · 1 October 2026
NALCO’s processing chain adds five annual observations for hydrate, aluminium and sales. The ambiguous bauxite production-table row is held separately from existing excavation observations.
Plant boundaries matter
Rourkela adds three historical crude-steel values and two plant-unit PBT observations. The near-flat output year remains visible beside financial recovery. NALCO supplier purchases are a separate procurement measure; do not sum different material stages or financial categories.
Chromite-to-ferrochrome checkpoint · 2 October 2026
IMFA’s existing company entry now connects two named mines, Odisha processing and domestic/international sales. Company-wide workforce and supplier shares remain separate from plant-local measures. The three-chain research is still incomplete for plant jobs and suppliers.
Plant-record checkpoint
IMFA’s reconciled record distinguishes Kalinganagar clearance transfer, Choudwar furnace input ratios and held mine workforce/output data. No employment total or expanded capacity is inferred from these records.
Industrial work: dates and categories
Rourkela’s historical employment record now distinguishes manpower, project contract workers and other contract work at 1 April 2015. This strengthens the historical record without supplying a current plant employment total.
Comparable manufacturing checkpoint · 4 October 2026
The manufacturing study reuses 15 existing physical-output observations across NALCO, Rourkela and IMFA, adds operating evidence, and retains different plant/company boundaries. No statewide output, employment or profit total is inferred. Structured register.
Cement and fertiliser checkpoint · 4 October 2026
Plant output and district business questions adds named IFFCO Paradeep and Dalmia Rajgangpur line evidence. Production, sales, power generation and company-wide figures retain distinct scopes; no local jobs or supplier orders are inferred.
Food-processing evidence · 4 October 2026
The dairy and processing study connects existing crop and milk records with dated OMFED procurement, turnover and a historical conversion tender. Physical output, supplier contracts and district business profitability remain separate questions.
Sugar-output checkpoint · 2026-10-06
Sugar-factory study adds dated input/output fields, preserving year labels, ownership changes and recovery-rate conflicts. The original state table remains pending page-image review.
Footnotes
Sources to follow
- NALCO Production and Financial Highlights FY2025–26
- SAIL Annual Report 2025–26
- Rourkela Steel Plant EC implementation, October 2025–March 2026
- IMFA Annual Report 2025–26
- SAIL Annual Report 2024–25
- CAG Report 38 of 2025: Performance of Blast Furnaces in SAIL
- SAIL Rourkela plant page: facility and document directory
- NALCO 45th Annual Report 2025–26